Project Overview The Matanuska-Susitna Borough (MSB) proposes to extend Engstrom Road by establishing a new roadway connection between East Wolf Creek Road and East Aspen Ridge Road. In addition, the MSB plans to upgrade two sections of existing roadway, including:

  • The section of existing road between East Wolf Creek Road and East Tex-Al Drive

  • The section of existing road between East Aspen Ridge Road and East Beechcraft Road


  • Upon completion, the entire length of the project corridor will consist of a two-lane roadway designed and constructed to Major Collector standards. The project may include the construction of a pathway, depending on cost.

    Addressing Connectivity & Congestion
    The 2035 Long Range Transportation Plan (LRTP) identified that a connection between Engstrom Road and Tex-Al Road would provide nearby subdivisions with access to Palmer-Fishhook and Wasilla-Fishhook, which would relieve congestion and increase safety along Engstrom Road and at the Engstrom-Bogard Intersection.

    The Engstrom Road North Extension to Tex-Al Drive project aligns with key MSB plans, including:
  • 2035 Long Range Transportation Plan (LRTP)
  • 2022 Official Streets and Highways Plan (OSHP)
  • 2024 Transportation Infrastructure Program 2024 (TIP24)
  • Engstrom to TexAl Mailing List Sign-Up
    First
    Last

    Mailing List Sign-Up Project Status The project is just getting started! This website will be populated as the project evolves. Please sign up for our email list to receive project updates.

    Through summer and fall 2025, field crews will be in the project area to delineate wetlands and cultural resources, survey the existing easements, and collect geotechnical information.

    A public meeting is anticipated to take place in the Fall/Winter of 2025.
     

    Project Components

    In summer/fall of 2025 field studies will take place within existing public easements or rights-of-way including environmental, geotechnical, and survey.

    Improvements to existing roadways are proposed to ensure seamless integration with the new roadway.

    The Borough will evaluate and acquire necessary land for the project.

    Coordination with utility owners will ensure that any affected utilities are relocated with minimal disruption.

    Roadside ditching and culverts will be incorporated into the roadway design to ensure adequate water flow to preserve the roadbed.

    The roadway will be equipped with appropriate signage and striping.

    Visit https://dnr.alaska.gov/mlw/ for information on major programs supported by the Alaska Department of Mining, Land, and Water.

    The project includes several key components to ensure safe, efficient, and sustainable construction, including the following:

    Project Maps OVERVIEW EASEMENTS

    Timeline

    Resources Notice of Field Studies This postcard informs nearby property owners about upcoming field studies for the Engstrom Road North Extension to Tex-Al Drive project, planned for summer 2025. View Mailer Scoping Letter The agency scoping letter provides an overview of the project and requests input from relevant agencies as part of the environmental review process. View Scoping Letter Design Study Report The DSR provides intial conceptual design alternatives and recommendations for the project. View DSR

    Upcoming Events Public Open House Past Event When:
    Thursday, November 13, 5:30-7:30 PM

    Where :
    Location: Mat-Su Central School
    2055 N. Stringfield Rd
    Palmer, AK 99645
    Future Events Date: TBD
    Location: TBD
    Public Meeting #2 Public Meeting #3 Date: TBD
    Location: TBD

    Engstrom to TexAl Mailing List Sign-Up
    First
    Last

    Leave A Comment
    Engstrom to TexAl Comment Form
    First and Last

    Join the Mailing List

    Andrew.Strahler@matsugov.us FOLLOW US JOIN US CONTACT US Andrew Strahler, P.E. MSB Civil Construction Project Manager
    1-907- 861-7710
    Heather Campfield, IAP2 HDL Public Involvement Coordinator
    (907) 761-1205
    Volunteer Opportunities Serve on a Borough Board Employee Mail & Services © 2025 Matanuska-Susitna Borough | 350 E. Dahlia Ave., Palmer, AK 99645
    (907) 861-7801 | Main Borough Building Hours: Mon.- Fri. 8 A.M. - 5 P.M.
    HCampfield@hdlalaska.com Job Opportunities